%0 Journal Article %T The Eastern Turkmenistan multi-layer deposits development and the disadvantages of their accelerated commissioning into pilot operation %A Gurbanguly, Y.. %A Ovezov, M.. %A Esedulaev, R.. %K multilayer deposits, accelerated commissioning, gas condensate, water-gas contact, field development, natural gas, gas industry %J Oil and gas technologies and environmental safety %D 2025 %N 2025 %P 8 %I Astrakhan State Technical University